APR Energy has provided customers worldwide with fast, full-service and flexible power solutions since 2004.

South Australia | SOUTH AUSTRALIA POWER NETWORKS

276MW of fast-track power to provide grid stability and mitigate risks of intermittent renewables.

See Case Study
South Australia

Puerto Rico | U.S Army Corps of Engineers

85MW of emergency power for hurricane relief, 60MW commissioned 17 days after contract signature.

See Case Study
Mobile gas turbine loaded on cargo ship to Puerto Rico

US Virgin Islands | VIWAPA

First of its kind, mobile gas turbine solution to run on LPG.

See Case Study
US Virgin Islands

Australia | Horizon Power

Mobile turbine project delivered 100MW of reliable, emissions-friendly bridging power in extreme conditions.

See Case Study
Mobile Turbine Generator Bridging Power in Australia

Benin | MEEM

Flexible turbine power solution allowed customer to switch fuels throughout contract based on availability and cost.

See Case Study
Benin Power Project | APR Energy

Botswana | BPC

Two diesel power module projects providing peaking and bridging power while permanent plant is built.

See Case Study
Botswana BPC Power Plant | APR Energy

Uruguay | UTE

300MW gas turbine solution to back up hydro generation and bridge the power gap until a new power plant was constructed.

See Case Study
Uruguay Punta del Tigre Power Plant | APR Energy

Myanmar | MEPE

Gas power module solution producing 102MW of electricity and serving over six million people.

See Case Study
Myanmar