TURBINES À GAZ MOBILES

En tant que premier fournisseur mondial de turbines mobiles rapides, APR Energy dispose de la flotte de turbines mobiles la plus avancée de l’industrie. Nos unités TM2500 délivrent 20 à 35 MW d’électricité chacune et sont modulables pour fournir l’équivalent d’une centrale électrique traditionnelle en quelques jours seulement. Économes en carburant, énergétiquement denses et peu polluantes, ces turbines flexibles peuvent basculer entre un large éventail de carburants et atteindre une puissance maximale en moins de 10 minutes.

Voir une usine de turbine à gaz mobile en réalité virtuelle

Mexico - 60MW | Emergency Power for Pemex

60MW of Fast Power for Puerto Rico

Egypt - 75MW | Fast-Track Installation

Australia - 100MW | Site Aerial View

Uruguay - 300MW | Fast-Track Installation (Phase II)

Libya | Rapid Gas Turbine Deployment

ÉTUDES DE CAS Afficher tout

Egypt (ETHYDCO)

Aerial view of dedicated industrial power station in Egypt serving a polyethylene plant

Three-turbine bridging power solution for major chemical facility awaiting completion of permanent generation.

Uruguay (UTE)

Uruguay Punta del Tigre Power Plant | APR Energy

300MW gas turbine solution to back up hydro generation and bridge the power gap until a new power plant was constructed.

Australia (Hydro Tasmania)

Tasmania Power Plant | APR Energy

Three-turbine emergency power solution following prolonged hydro shortage and faulty undersea cable.

Australia (Horizon Power)

Mobile Turbine Generator Bridging Power in Australia

Mobile turbine project delivered 100MW of reliable, emissions-friendly bridging power in extreme conditions.

Libya (GECOL)

Libya

450MW fast-track baseload operation across six sites, supporting aging infrastructure.

Japan (TEPCO)

Japan Hitachinaka Power Plant | APR Energy

Over 200MW of rapidly delivered emergency power following the 2011 earthquake and tsunami, supporting rebuilding and disaster recovery.

US Virgin Islands (VIWAPA)

US Virgin Islands

Modern, utility-grade technology replaced aging infrastructure to help improve efficiency and reliability.

Benin (MEEM)

Benin Power Project | APR Energy

Flexible turbine power solution allowed customer to switch fuels throughout contract based on availability and cost.